Fig.1.
A
4. Installation and start.
Royal
1.
Place the machine on a flat level and waterproof surface.
2.
Assemble top cabinet and base cabinet
with the enclosed screws M6 x 20.
M6 x 20
8
.
OBSERVE!
Make sure there is a space behind the machine
for free flow of air.
( minimum 10cm ).
NOTE!
This installation part is only valid Freshbrew machine
Excellence with a chilled water function (with carbonic
acid).
3a.
Apply
the enclosed 8mm hose (A)
(parallely),
between
the over cabinet and base cabinet, left to left a.s.o.
3pcs.
(See fig.1).
3b.
Valid for machine with chilled water unit.
Apply parallel
the enclosed 8mm hose (A) between the
over cabinet and base cabinet, left to left a.s.o.
2pcs.
NOTE!
Do not connect cable to the cabinet
before
machine is warm. (this will take approximately 10 minutes).
A