4. Installation and start.
Royal
4.
Apply carbon dioxide tube.
(See fig.2). Open the tap,Check the manufacturing
pressure: 3.5bar. Adju 0.5 -1.0 bar. Loosen screws and dismantle left
side sheet. (see fig.2). Place carbon dioxide tube.(fig.3). Lift in waste box.
(see fig.4)
NOTE!
Valid for freshbrew coffee machine with chilled water unit, only.
Installation and start,
starting up machine.
(No water pump in machine .)
Follow these directions; no 1, 2, 3b, 5, 6, 7, 8, 9,10, 11, 12, 13, 14. 16, 17, 18.
9
.
fig.2.
fig.3.
fig.4.
Connecting electricity to
(upper cabinet)
machine
.
5.
Connect the electrical plug to a separate
grounded wall socket 230V 10A.