3
2D. Electrical
Refer to the
IMPORTANT SAFETY INSTRUCTIONS
at the beginning of this manual for important wiring information.
2D-1. Main Power
• Connect the UV-C Pro so that it operates simultaneously with the pool pump.
• An electrical junction box and wires are provided on the left wall of the enclosure for a 1/2” conduit connection.
• Remove the protective plug and install electrical fittings as required to meet local codes.
• Run service wires to the box and connect to provided wiring.
2D-2. Bonding Lug
Connect a solid copper conductor to the bonding lug on the left side of the UV-C Pro to an appropriate earth contact.
(Figure 1)
Figure 2: Remote Contact Locations
2D-3. System Control
• Remote start contacts have been provided for remote ON-OFF operation of the UV-C Pro.
• These should be wired to an external device that closes when the pool pump is ON and opens when it is OFF.
• Failure to use the remote start contacts may result in damage to the unit not covered under warranty.
2E. Plumbing
The UV-C Pro can easily be added into the pool’s plumbing loop. All the components are contained inside the enclosure
so only the water inlet and outlet need to be installed into the pool’s return line.
IMPORTANT! Plumbing inlet and outlet layout may vary from UV-C PRO-500D model shown in Figure 1. Always plumb
flow according to the marking on the unit.
2E-1. Plumbing the UV-C Pro
• Install in the main return line of the pool immediately after the filter and preferably before the heater.
• Install cleaners such as chlorinators after the UV-C Pro.
• The outlet of the UV-C Pro must be at least 10 feet from the first return of the pool.
• Use the fittings provided in the parts kit to connect the UV-C Pro inlet and outlet to the plumbing.
Connection Points for
Remote Start Contacts
2. INSTALLATION