background image

10

4. MAINTENANCE & SERVICE

4B-3 Quartz Tube Installation 

1.  Place a sealing O-ring approximately 1/2in (12.7mm) from the end of the quartz tube. Insert quartz tube into the UV 

reactor until it is fully seated. 

 

NOTE:

 If the end of the quartz tube is protruding from the UV reactor, the alignment is off. Remove and re-insert the 

quartz tube to seat it properly as shown in 

Figure 5

.  

2.  Place the lamp retainer over the quartz tube and attach the lamp retainer using the lamp retainer screws and 

washers as shown in 

Figure 4

. Make sure the lamp retainer flanges are fully seated against the UV reactor.

3.  Tighten main inlet and outlet fittings on the UV-C Pro.

4.  Turn the circulation pump ON and check the quartz tube seals for leaks. 

5.  Turn the circulation pump OFF once you have confirmed that the quartz tubes are not leaking. 

4B-4 Re-installing the UV Lamp(s) 

NOTE:

 Make sure to handle the UV lamp as described in 

SECTION 4B-1

1.  TURN OFF YOUR PUMP IF YOU HAVE NOT DONE SO. 

2.  Slowly press the UV lamp fully past the lamp retainer tabs and into the quartz tube until it is seated on the lamp 

cushion in the bottom of the quartz tube. 

3.  Connect the UV lamp connector to the connector on the ballast. 

ENVIRONMENTAL NOTICE: 

Hg-Lamp CONTAINS MERCURY. Manage in accordance with disposal laws. See: www.

lamprecycle.org

Figure 6: Battery Replacement

4C. PLC Memory Backup Battery Replacement

1.  On the top of the PLC, press the retaining clip on the battery door and swing the battery door open.

2.  Remove the old battery from right side of the coin-type slot.

3.  Install the new battery with the +, or flat, side out.

4.  Close the battery door so that it locks securely.

5.  Make note of the date the battery was replaced (it must be performed annually).

4D. Winterizing

If the pool will be shutting down for the winter months and the UV-C Pro will remain exposed to freezing temperatures, the 

unit must be drained to prevent freeze damage to the wetted components. To drain the UV-C Pro, see the following steps.

1.  If the UV-C Pro is mounted below the water level, isolation valves must all be CLOSED to prevent excess water from 

draining into the unit.

2.  Loosen main inlet and outlet fittings on the UV-C Pro, this should allow most water to drain from the UV-C Pro.

3.  Open the door and locate the bottom quartz tube in each UV reactor (Refer to 

Figure 4

).  Remove these quartz 

tubes to drain the remaining water from the UV reactor(s).

Properly Seated Quartz Tube

Improperly Seated Quartz Tube

Battery

Содержание DEL AOP PRO 200

Страница 1: ...4 2813 01 Rev A CMPCOMMERCIAL COM DEL UV C PRO 200 350 500 INSTALLATION INSTRUCTIONS PRODUCT MANUAL...

Страница 2: ...ssible to anyone in the pool Never attempt any servicing while unit is wet For your safety do not store or use gasoline chemicals or other flammable liquids or vapors near this or any other appliance...

Страница 3: ...on 4 3C System Shut Down 6 3D Water Chemistry 6 4 Maintenance Service 4A System Electromechanical Overview 7 4B UV Reactor Service and Maintenance 7 4C PLC Memory Battery Backup Replacement 10 4D Wint...

Страница 4: ...esults UV C is compatible with all traditional sanitizers These systems are cost effective to operate and maintain UV C Pro is NSF certified for supplemental disinfection of pools and spas UV C PRO 20...

Страница 5: ...a protected from rain and direct sunlight Locate the unit out of reach of sprinklers or drainage spouts Allow sufficient access for maintenance 2 ft clearance above and 1 ft around the unit and all pl...

Страница 6: ...to an external device that closes when the pool pump is ON and opens when it is OFF Failure to use the remote start contacts may result in damage to the unit not covered under warranty 2E Plumbing The...

Страница 7: ...screen includes status indicators and text to communicate real time system conditions as well as access to historical data The five function buttons allow user navigation of the menus and user input T...

Страница 8: ...lert reminders More than 10 remaining no banner message 10 remaining SERVICE SOON banner message 5 remaining SERVICE REQUIRED banner message 0 remaining SERVICE PAST DUE alert banner message with yell...

Страница 9: ...Followed for servicing or storage 1 Shut off water flow to the unit and or close isolation valves if available 2 Shut off power at the breaker 3 Open enclosure door to access internal components NOTE...

Страница 10: ...p is difficult to remove use a slight twisting motion or remove the lamp retainer AVOID TOUCHING THE UV LAMP GLASS WITH YOUR BARE HANDS Oils on your hands can cause hot spots on the UV lamp and shorte...

Страница 11: ...8 4 MAINTENANCE SERVICE Inlet Flange Outlet Flange Flow Switch Location not shown Ballast UV Reactor Figure 3 UV C Pro Electro Mechanical Overview...

Страница 12: ...emoval Figure 5 UV Quartz Tube lnstallation NOTE DAMAGES CAUSED BY BROKEN QUARTZ TUBES ARE NOT COVERED UNDER THE LIMITED WARRANTY UV Lamp Quartz Tube Lamp Retainer Sealing O ring Lamp Retainer Screws...

Страница 13: ...tom of the quartz tube 3 Connect the UV lamp connector to the connector on the ballast ENVIRONMENTAL NOTICE Hg Lamp CONTAINS MERCURY Manage in accordance with disposal laws See www lamprecycle org Fig...

Страница 14: ...box b Check for loose connections or wiring breaks in the main power wiring leading to the UV C Pro c Check internal circuit breaker Symptom SYSTEM WAITING ON REMOTE START CONTACTS message 1 Remote s...

Страница 15: ...u call 1 800 733 9060 or visit www cmpcommercial com 5D Standard Replacement Parts List DESCRIPTION PART NUMBER REPLACEMENT INTERVAL PLC MEMORY BACKUP BATTERY included with PLC option only 5 1402 Annu...

Страница 16: ...Pro Pressure Drop Characterization NOTE Tested on simulated recirculation system using a variable speed pump No back pressure added Actual results will vary depending on pump and plumbing variables AP...

Страница 17: ...utlet unions or flanges b Flow the cleaning solution from bottom to top 2 When cleaning is complete drain the UV C Pro completely from the inlet union or flange and run the pool system immediately for...

Страница 18: ...Below Keep for Your Records Installer _______________________________________________________________ System Purchased From ______________________________________________ Installation Date __________...

Страница 19: ...16 NOTES...

Страница 20: ...CMP LLC 36 HERRING ROAD NEWNAN GA 30265 WWW CMPCOMMERCIAL COM 1021ab...

Отзывы: