![ClimateMaster TRC09 Series Скачать руководство пользователя страница 36](http://html1.mh-extra.com/html/climatemaster/trc09-series/trc09-series_installation-operation-and-maintenance_2624755036.webp)
C L I M A T E M A S T E R W A T E R - S O U R C E H E A T P U M P S
Consoles
R e v. : 0 8 / 2 4 / 1 5
36
C l i m a t e M a s t e r Wa t e r - S o u rc e H e a t P u m p s
Start-Up Log Sheet
Installer:
Complete unit and system checkout and follow unit start-up procedures in the IOM. Use this form
to record unit information, temperatures and pressures during start-up. Keep this form for future reference.
Job Name:
Street Address:
Model Number:
Serial Number:
Unit Location in Building:
Date:
Sales Order No:
In order to minimize troubleshooting and costly system failures, complete the following checks and data
entries before the system is put into full operation.
Temperatures: F or C
Antifreeze: __________________%
Pressures: PSIG or kPa
Type __________________
Cooling Mode
Heating Mode
Return-Air Temperature DB
Supply-Air Temperature DB
Temperature Differential
Entering Fluid Temperature
Leaving Fluid Temperature
Temperature Differential
Water Coil Heat Exchanger
(Water Pressure IN)
Water Coil Heat Exchanger
(Water Pressure OUT)
Pressure Differential
Flow Rate GPM (l/s)
Supply Voltage at Contactor
Transformer Low Side Volts
Compressor Amps
Motor Amps
Allow unit to run 15 minutes in each mode before taking data.
Do not connect service manifold gauges during start up unless instructed by ClimateMaster service tech.