Console (CCE) Series
Tranquility Console
(TRC) Series
Commercial Console
Water-Source Heat Pumps
50Hz & 60Hz
Installation, Operation &
Maintenance Instructions
97B0035N01
Revision: 5 Nov., 2009B
Table of Contents
Model Nomenclature
3-4
General Information
5
Storage
6
Pre-Installation
6
Physical Data
7-9
Installation
10
Condensate Piping
11
Piping Connection
12-14
Piping Installation
15
Water-Loop Heat Pump Applications
16
Ground-Loop Heat Pump Applications
17
Ground-Water Heat Pump Applications
18
Water Quality Standards
20
Electrical Wiring - Line Voltage
21-23
Electrical Wiring - Low Voltage
24
Thermostat Wiring
25
Electrical Wiring Diagram Matrix
26
Electrical Wiring Schematics
27-31
CXM/DXM Controls
32-34
CXM/DXM Safety Control Reset
35-36
Unit Commissioning
and Operating Conditions
37
Piping System Cleaning and Flushing
38
Unit and System Checkout Procedure
39
Unit Start-Up
40
Unit Operating Conditions
41
Preventive Maintenance
43
Functional & Performance Troubleshooting
44-45
Refrigerant Circuit Diagram
46
Warranties
47-48
Revision History
50