Installation Guide PV ezRack STIII-A V1.1
Page9 / 16
No. 999-1009, Min’an Avenue, Xiang’an 18/20 Duerdin , Xiamen China 361006
Clayton VIC 3168
Tel: +86-592-5781288 Tel: +61-3-90176688
Fax: +86-592-5782298 Fax: +61-3-90176668
Email:
Email:
Website:
www.clenergy.com.cn
Website: www.clenergy.com.au
keep them in a same
line, as shown as Fig. 5.
Solution 3:
(10°-20°)
Step 1:
unfold pre-assembled
support as shown in
Figure 2;
Step 2:
Fasten the M12*100
bolts from Al Tube and H
Joint first, then rotate L
Fig. 2
Fig. 3
Fig. 4
Fig. 5
NOTE: The screw
heads have to keep in
a same direction