Installation Guide PV ezRack STIII-A V1.1
Page10 / 16
No. 999-1009, Min’an Avenue, Xiang’an 18/20 Duerdin , Xiamen China 361006
Clayton VIC 3168
Tel: +86-592-5781288 Tel: +61-3-90176688
Fax: +86-592-5782298 Fax: +61-3-90176668
Email:
Email:
Website:
www.clenergy.com.cn
Website: www.clenergy.com.au
anchor plate and S
anchor plate in order to
keep them in a same
line, as shown as Fig. 4.
Fig. 1
Fig. 2
Fig. 3
Fig. 4
3.1.2
Connect the
Pre-assembled Support
and Concrete Base by
using Foundation Bolts
(M16x240)
NOTE: The screw
heads have to keep in
a same direction