Installation Guide PV ezRack STIII-A V1.1
Page12 / 16
No. 999-1009, Min’an Avenue, Xiang’an 18/20 Duerdin , Xiamen China 361006
Clayton VIC 3168
Tel: +86-592-5781288 Tel: +61-3-90176688
Fax: +86-592-5782298 Fax: +61-3-90176668
Email:
Email:
Website:
www.clenergy.com.cn
Website: www.clenergy.com.au
3.2.1
Mark the locations for
Rail on Tri-groove
beam according to
Planning layout.(The
dimensions shown on
the right is based on an
example of panel size)
3.2.2
Before installing the T
rails to the Tri-groove
beam, make sure the
rail is long enough,
otherwise connect the
T rails using T rail
splice.
It is recommended to
connect the rails before
installing them on the
Tri-groove Beam
3.2.3
Before installing the T
rails, mark the position
of the rails on the
beam