Installation Guide PV ezRack STIII-A V1.1
Page11 / 16
No. 999-1009, Min’an Avenue, Xiang’an 18/20 Duerdin , Xiamen China 361006
Clayton VIC 3168
Tel: +86-592-5781288 Tel: +61-3-90176688
Fax: +86-592-5782298 Fax: +61-3-90176668
Email:
Email:
Website:
www.clenergy.com.cn
Website: www.clenergy.com.au
Recommended Torque:
M16:
135~150
N
•
m
3.1.3
Check the system and
fasten the rest of bolts.
Recommended Torque:
M8: 18~20N
•
m
M12:
40~45
N
•
m
3.1.4 According to the
planning, repeat the
above operation.
Note that all the
Tri-Groove Beam must
be in the same line.
3.2 Install the T Rail