Installation Guide PV ezRack STIII-A V1.1
Page5 / 16
No. 999-1009, Min’an Avenue, Xiang’an 18/20 Duerdin , Xiamen China 361006
Clayton VIC 3168
Tel: +86-592-5781288 Tel: +61-3-90176688
Fax: +86-592-5782298 Fax: +61-3-90176668
Email:
Email:
Website:
www.clenergy.com.cn
Website: www.clenergy.com.au
2.3
System Overview
1)
End Clamp
2)
Inter Clamp U18
3)
T Rail Splice
4)
Rail Clamp
5)
T Rail 110*4200
6)
T Rail 110
7)
Truss support 30
°
8)
Angle Al Support
(Optional )
2.4
Notices and Safety Precautions
2.4.1 Notices during Stainless Steel Fasteners Installation
:
Improper operation may lead to deadlock of unlocking Bolts and Screws
1
.
Reduce the friction coefficient:
(
1
)
Ensure the surface clean and smooth ( no dirt or contaminant )
(
2
)
Apply lubricant(grease or 40# engine oil) to fasteners prior to tightening. You
should be using a lubricant to stop galling in the threads;
2
.
Proper instruction:
:
(
1
)
Apply force to fasteners in the direction of thread;
(
2
)
Apply force uniformly, keep eyes on safe torque;
(
3
)
Professional tools are recommended;
(
4
)
Avoid working at high temperature, or electric tools for tightening;
3
.
Safe Torques
Please refer to safe torques defined in the guide;