5.3 PV Module Installation (without Dry Bars)
5.3.1 Same with step 5.2.1
5.3.2 Fix Module Clamp 40 to PV frame
After all PV Modules are placed properly, use the Module Clamp 40 to fix the back frame of PV
Module on T-Rail, and fasten with 6mm Allen Key as shown on the Fig 32.
Note:
1. Apply 4 x Module Clamps 40 for each PV Module.
2. Please refer to the PV module installation instruction to confirm the clamping zones. It is recommended that the
installation position of Module Clamp 40 from the PV module end to the clamps is 20% of module length (if not
conflicted with the clamping zone of panels) as shown in Fig 33.
3. Recommended torque: M8 bolts is 18-20 N.m