Maintain 6mm gap between the PV Module and Dry Bar-Landscape/ Dry Bar-Landscape (with Bushing)
as shown in Fig 18.
Turn the T head bolt clockwise with Straight-slot Screwdriver until the T head bolt can’t move anymore
as shown in Fig 19.
Fasten M6 Nuts and T head bolts with Socket Spanner 10mm tightly.
Recommended Torque:
M6 Bolts: 7~8 N.m
Fig.18
Note: Please note that grease must be applied and tool speed must be controlled while fastening the
bolts.