CLEMENTS
CLEMENTS
CLEMENTS
CLEMENTS
13
Operation
1.
Place the pump on a flat stable horizontal surface.
2.
Connect a short length of silicone tubing from the trap jar centre
port to the “I
N
” (or directional arrow symbol) side of the bacterial/
hydrophobic filter. Connect a short length of silicone tubing from
the other side of the filter to the pump port.
Connect a short length of silicone tubing from the trap jar
peripheral port to the “V
ACUUM
” port of the collection jar.
3.
Connect the long silicone tubing to the collection jar “P
ATIENT
” port.
4.
Connect supplied power cord to power socket at rear of pump.
Connect power cord to compatible mains outlet.
5.
Press switch button to turn on pump. (Press again to turn off.)
Controls and Operation
Pump Controls
Trap Jar
Vacuum
Gauge
“VACUUM” port
(above float valve)
“PATIENT” Port
Connect Patient
Tubing
Vacuum
Control
ON / OFF
Switch
Bacterial / Hydrophobic Filter
» Must ALWAYS be fitted «
“IN” or Δ Side
of Filter
Overflow float
valve fitted
inside jar
Overflow float
valve fitted
inside trap jar
Содержание SUC84602
Страница 22: ...CLEMENTS CLEMENTS CLEMENTS CLEMENTS 22 Wiring Diagram Wiring Diagram...
Страница 32: ......