5
Testing Power Path
1 . Turn off power supply .
2 . Remove chlorinator from wall .
3 . Remove 4 screws to remove cover (support cover and leave ribbon wire connected to power PCB) .
4 . Turn on power supply .
5 . Use multimeter set on AC volts to test between A & B .
Results = 220V?
YES
NO
Unit receiving power – continue testing.
Have qualified electrician rewire
chlorinator to 220V or determine
why no voltage.
Replace circuit breaker.
(see Circuit Breaker pg. 4)
Transformer receiving power
circuit breaker OK (continue testing).
6. Test between A & C = 220V?
YES
NO
7. Test between D&E and E&F
Results should be as printed on transformer (this
varies for different models).
(Depending upon the type of transformer, this
test may be done at the PC board.)
Both tests read OK?
YES
NO
Transformer is good.
Replace transformer.
(see Transformer pg. 9)
D E F
A
B
C
D
F
E
Содержание Zodiac LM2 Series
Страница 1: ...LM2 LM3 Series Troubleshooting Manual ...