10
G. Install anchor bolts. Position the columns on the installation layout. Check the
columns verticality with level bar, and adjusting with the shim if the columns are
not vertical. Do not tighten the anchor bolts at this time.
(See Fig.20)
Fig. 20
Adjusting with
the shim
Drilling
Cleaning
Bolting
4
3
/
8
”
Note: Minimum embedment of anchors is
110mm
.
57
56
Width between columns:
3137mm
Overall width:
3829mm