11
H. Install overhead top beam
1. With help of the hook of top beam, put one side of top beam on top of the extension column
and connecting the top beam to extension column by bolts, tighten the bolts. Then
assemble the connecting bracket
(See Fig. 21).
Fig. 21
Hook on to the
extension columns
Tighten the bolts
23
22
21
27
1
Содержание CL6800C
Страница 1: ...TWO POST LIFT MODEL CL6800C Original...
Страница 4: ...2 Arm Swings View Fig 2 3829mm 2787mm 109 3 4 150 3 4...
Страница 18: ...16 1 2 Connecting cable for high setting See Fig 29 Fig 29 High setting Cable 1 Cable 2 Cable 1...
Страница 19: ...17 2 Low setting cable connection See Fig 30 107 Cable 1 Cable 2 Fig 30 Low Setting Cable 2 108...
Страница 27: ...25 IV EXPLODED VIEW Fig 44...
Страница 33: ...31 3 Manual power unit Explode View 81513003 81513004 220V 50Hz Single Phase Fig 47 380V 50Hz 3 Phase...
Страница 41: ...39...