3
II. INSTALLATION REQUIREMENT
A.
TOOLS REQUIRED
Rotary Hammer Drill (Φ19)
Carpenter’s Chalk
Hammer
Screw Sets
Level Bar
Tape Measure (7.5m)
English Spanner (12")
Pliers
Wrench set
:(10
#
、13
#
、14
#
、15
#
、17
#
Lock Wrench
19
#
、24
#
、27
#
、30
#
)
Ratchet Spanner With Socket (28
#
)
Fig.3
Socket Head Wrench (3
#
, 5
#
, 8
#
)
Содержание CL6800C
Страница 1: ...TWO POST LIFT MODEL CL6800C Original...
Страница 4: ...2 Arm Swings View Fig 2 3829mm 2787mm 109 3 4 150 3 4...
Страница 18: ...16 1 2 Connecting cable for high setting See Fig 29 Fig 29 High setting Cable 1 Cable 2 Cable 1...
Страница 19: ...17 2 Low setting cable connection See Fig 30 107 Cable 1 Cable 2 Fig 30 Low Setting Cable 2 108...
Страница 27: ...25 IV EXPLODED VIEW Fig 44...
Страница 33: ...31 3 Manual power unit Explode View 81513003 81513004 220V 50Hz Single Phase Fig 47 380V 50Hz 3 Phase...
Страница 41: ...39...