26
13. Adjust the front of the rails (that you left loose in
step 10
) so that the threaded hole in the center of
the front of the rail aligns with the screw in the flange.
14. Screw the flange screws tightly into the rails, as shown in
Figure 3-8
.
Figure 3-8:
Securing the Chassis to the Rails
15. Firmly tighten the front rail screws.
For the VFrame Evaluation Test Plan, continue to
step b
of
“Hardware Installation Steps” on page 13
in
the
“VFrame Evaluation Test Plan”
.
Attach a Serial Console Cable to a PC or Terminal
1. Connect the cable from the Topspin serial console to your terminal or management workstation.
Use the straight-through M/F serial cable, which is provided in the Topspin package.
NOTE:
For detailed information on how to connect the serial console cable, please see the
documentation included with the serial cable kit.
2. Open a terminal emulation window using a program such as HyperTerminal for Windows. Set your
terminal parameters to the following:
•
Baud: 9600 bps
•
Data Bits: 8
•
Parity: None
Содержание TOPSPIN SFS 3012
Страница 6: ...vi ...
Страница 12: ...xii Phone 800 499 1473 Online Help Desk http support topspin com ...
Страница 18: ...xviii ...
Страница 22: ...4 ...
Страница 26: ...8 7 Push the ejector lever up until it clicks into place Figure 2 3 Closing the Ejector Lever ...
Страница 30: ...12 7 Close both fastener levers simultaneously and completely Figure 2 8 Closing Switch Ejector Levers ...
Страница 36: ...18 ...
Страница 40: ...22 9 Position the chassis brackets to the rack rails as shown in Figure 3 3 Figure 3 3 Rail Positioning ...
Страница 58: ...40 ...
Страница 66: ...48 ...
Страница 78: ...60 ...