Installing the Optional 42-Inch Display
Page 182
© 2015 Cisco Systems, Inc. All rights reserved.
6
Level the display in relation to the fascia and the rest of the system. Rock back the display to separate the
two pieces (some force might be required). Loosen the four screws that hold the display to the display
bracket. The display pivots on the top right screw. Rotate the display and tighten the screws after the display
is level. Note the use of a “stubby” screwdriver. A Phillips driver and a ratcheting wrench may also be used.
Bracket pivots
on this screw
Stubby screwdriver
or Phillips driver with
ratcheting wrench
Содержание TelePresence IX5000
Страница 69: ...Installing Endpoint Structure Cables 2015 Cisco Systems Inc All rights reserved Page 69 Codec and cable runner ...
Страница 71: ...Installing Endpoint Structure Cables 2015 Cisco Systems Inc All rights reserved Page 71 ...
Страница 72: ...Installing Endpoint Structure Cables Page 72 2015 Cisco Systems Inc All rights reserved ...
Страница 137: ...Installing the Second Row Table IX5200 Only 2015 Cisco Systems Inc All rights reserved Page 137 Cable Routing Left ...
Страница 138: ...Installing the Second Row Table IX5200 Only Page 138 2015 Cisco Systems Inc All rights reserved Cable Routing Center ...
Страница 139: ...Installing the Second Row Table IX5200 Only 2015 Cisco Systems Inc All rights reserved Page 139 Cable Routing Right ...
Страница 185: ...Cable Routing Diagrams 2015 Cisco Systems Inc All rights reserved Page 185 ...
Страница 186: ...Cable Routing Diagrams Page 186 2015 Cisco Systems Inc All rights reserved ...