Installing and Cabling the Displays
Page 86
© 2015 Cisco Systems, Inc. All rights reserved.
11
Check that the system is plumb using a spirit or digital level. Adjust the two outer feet as needed
using a 13mm open-end wrench or adjustable wrench on the hex profile above the foot base.
Make
sure that all six feet are touching the floor
and tighten the locknuts on all six feet using a 19mm ratcheting
box wrench.
19mm Lock nut
13mm hex
profile nut
Содержание TelePresence IX5000
Страница 69: ...Installing Endpoint Structure Cables 2015 Cisco Systems Inc All rights reserved Page 69 Codec and cable runner ...
Страница 71: ...Installing Endpoint Structure Cables 2015 Cisco Systems Inc All rights reserved Page 71 ...
Страница 72: ...Installing Endpoint Structure Cables Page 72 2015 Cisco Systems Inc All rights reserved ...
Страница 137: ...Installing the Second Row Table IX5200 Only 2015 Cisco Systems Inc All rights reserved Page 137 Cable Routing Left ...
Страница 138: ...Installing the Second Row Table IX5200 Only Page 138 2015 Cisco Systems Inc All rights reserved Cable Routing Center ...
Страница 139: ...Installing the Second Row Table IX5200 Only 2015 Cisco Systems Inc All rights reserved Page 139 Cable Routing Right ...
Страница 185: ...Cable Routing Diagrams 2015 Cisco Systems Inc All rights reserved Page 185 ...
Страница 186: ...Cable Routing Diagrams Page 186 2015 Cisco Systems Inc All rights reserved ...