Installing and Cabling the Displays
© 2015 Cisco Systems, Inc. All rights reserved.
Page 83
8
Level the displays and and make the left and right displays vertically level with the center display. Use
the left and right levelers to create an even gap between the left and center, and center and right,
displays. Use a 6mm T-handle hex driver to turn the leveler from below (it has a socket in the end of the
threaded stud). Tighten the lock nut on the levelers after you complete leveling.
Leveler
Leveling
bracket
View from back - use a 6mm T-handle
hex driver from below to adjust levelers
Содержание TelePresence IX5000
Страница 69: ...Installing Endpoint Structure Cables 2015 Cisco Systems Inc All rights reserved Page 69 Codec and cable runner ...
Страница 71: ...Installing Endpoint Structure Cables 2015 Cisco Systems Inc All rights reserved Page 71 ...
Страница 72: ...Installing Endpoint Structure Cables Page 72 2015 Cisco Systems Inc All rights reserved ...
Страница 137: ...Installing the Second Row Table IX5200 Only 2015 Cisco Systems Inc All rights reserved Page 137 Cable Routing Left ...
Страница 138: ...Installing the Second Row Table IX5200 Only Page 138 2015 Cisco Systems Inc All rights reserved Cable Routing Center ...
Страница 139: ...Installing the Second Row Table IX5200 Only 2015 Cisco Systems Inc All rights reserved Page 139 Cable Routing Right ...
Страница 185: ...Cable Routing Diagrams 2015 Cisco Systems Inc All rights reserved Page 185 ...
Страница 186: ...Cable Routing Diagrams Page 186 2015 Cisco Systems Inc All rights reserved ...