4-26
Cisco ONS 15454 DWDM Installation and Operations Guide, R6.0
September 2005
Chapter 4 Perform Node Acceptance Tests
NTP-G46 Perform the Line Amplifier Node with OSC-CSM Cards Acceptance Test
Step 22
If an OPT-PRE card is installed on the west side, complete the
Amplifier Laser and Power” task on page 4-41
. If not, continue with
Step 23
Complete the
“DLP-G79 Verify the OPT-BST Amplifier Laser and Power” task on page 4-40
for the
east OPT-BST amplifier.
Step 24
If an OPT-PRE amplifier is installed on the east side, complete the
Amplifier Laser and Power” task on page 4-41
. It not, continue with continue with
Step 25
Complete the
“DLP-G79 Verify the OPT-BST Amplifier Laser and Power” task on page 4-40
for the
west OPT-BST amplifier.
Step 26
Disconnect the TXP or tunable laser from the west OPT-BST card.
Step 27
Remove the loopback on the west OPT-BST amplifier created in
Step 28
Delete both OSC channels using the
“DLP-G186 Delete an OSC Termination” task on page 10-41
.
Step 29
Complete the
“NTP-G37 Run Automatic Node Setup” procedure on page 3-83
configuration.
Step 30
Create the two OSC channels using the
“NTP-G38 Provision OSC Terminations” procedure on
Stop
.
You have completed this procedure
.
NTP-G46 Perform the Line Amplifier Node with OSC-CSM Cards
Acceptance Test
Step 1
Complete the
“DLP-G46 Log into CTC” task on page 2-25
at the node where you want to perform the
acceptance test. If you are already logged in, continue with
Step 2
If you are using TXP_MR_2.5G cards, complete the
“DLP-G268 Provision TXP_MR_2.5G Cards for
Acceptance Testing” task on page 4-4
. If not, continue with
Step 3
From the View menu, choose
Go to Node View
.
Step 4
Click the
Alarms
tab.
a.
Verify that the alarm filter is not on. See the
“DLP-G128 Disable Alarm Filtering” task on page 8-28
as necessary.
Purpose
This procedure tests a line amplifier node with OSC-CSM cards installed
on both the east and west sides of the shelf by looping a single wavelength
through the shelf.
Tools/Equipment
A tunable laser or TXP_MR_2.5G card
An optical power meter or optical spectrum analyzer
2 bulk attenuators (10 dB) with LC connectors
Prerequisite Procedures
Required/As Needed
Required
Onsite/Remote
Onsite
Security Level
Superuser
Содержание ONS 15454 DWDM
Страница 38: ...Figures xxxviii Cisco ONS 15454 DWDM Installation and Operations Guide R6 0 August 2005 ...
Страница 54: ...Procedures liv Cisco ONS 15454 DWDM Installation and Operations Guide R6 0 August 2005 ...
Страница 64: ... 64 Cisco ONS 15454 DWDM Installation and Operations Guide R6 0 August 2005 Chapter ...