![Cisco ONS 15454 DWDM Скачать руководство пользователя страница 291](http://html.mh-extra.com/html/cisco/ons-15454-dwdm/ons-15454-dwdm_installation-and-operation-manual_63831291.webp)
4-11
Cisco ONS 15454 DWDM Installation and Operations Guide, R6.0
September 2005
Chapter 4 Perform Node Acceptance Tests
NTP-G43 Perform the ROADM Node Acceptance Test
For a 32DMX-O card:
a.
Choose
Provisioning > Optical Chn > Parameters
tabs.
b.
For each wavelength being tested, click the
Admin State
table cell and choose
OOS,MT
(ANSI) or
Locked,maintenance
(ETSI) from the drop-down list.
c.
Click
Apply
, then click
Yes
to confirm.
Step 15
Repeat
for the west 32DMX or 32DMX-O card.
Step 16
Complete the
“DLP-G310 Verify ROADM Node Pass-Through Channels” task on page 4-12
Step 17
Complete the following tasks for channels that will be added or dropped on the node.
•
DLP-G311 Verify the East ROADM Add/Drop Channels, page 4-16
•
DLP-G312 Verify the West ROADM Add/Drop Channels, page 4-18
Step 18
Display the east 32WSS in card view.
Step 19
Click the
Provisioning
>
Optical Chn Optical Connector [n]
>
Parameters
tabs, where n = the optical
connector number that carries the wavelengths you tested.
Step 20
Click the
Admin State
table cell then choose
IS,AINS
(for ANSI) or
Unlocked,AutomaticInService
(ETSI) from the drop-down list for all ports that were changed to OOS,MT or Locked,Maintenance.
Step 21
Click
Apply
.
Step 22
Repeat Steps
and
OOS,MT
or
Locked,maintenance
on the east 32WSS
card.
Step 23
Display the west 32WSS in card view.
Step 24
Repeat Steps
through
for all ports on the west 32WSS card.
Step 25
Display the east 32DMX in card view.
Step 26
Choose the
Provisioning > Optical Line > Parameters
tabs.
Step 27
For Port 33, click the
Admin State
table cell and choose
IS,AINS
(ANSI) or
Unlocked,AutomaticInService
(ETSI) from the drop-down list.
Step 28
Click
Apply
.
Step 29
Display the west 32DMX card in card view.
Step 30
Repeat Steps
through
for the west 32DMX card.
Step 31
Delete both OSC channels using the
“DLP-G186 Delete an OSC Termination” task on page 10-41
Step 32
Complete the
“NTP-G37 Run Automatic Node Setup” procedure on page 3-83
.
Step 33
Create the two OSC channels using the
“NTP-G38 Provision OSC Terminations” procedure on
Step 34
Click the
Alarms
tab.
a.
Verify that the alarm filter is not on. See the
“DLP-G128 Disable Alarm Filtering” task on page 8-28
as necessary.
b.
Verify that no equipment failure alarms appear on the node. If alarms appear, investigate and resolve
them before continuing. Refer to the
Cisco ONS 15454 Troubleshooting Guide
or the
Cisco ONS 15454 SDH Troubleshooting Guide
for procedures.
Stop
.
You have completed this procedure
.
Содержание ONS 15454 DWDM
Страница 38: ...Figures xxxviii Cisco ONS 15454 DWDM Installation and Operations Guide R6 0 August 2005 ...
Страница 54: ...Procedures liv Cisco ONS 15454 DWDM Installation and Operations Guide R6 0 August 2005 ...
Страница 64: ... 64 Cisco ONS 15454 DWDM Installation and Operations Guide R6 0 August 2005 Chapter ...