5-53
Cisco 2900 Series and 3900 Series Hardware Installation Guide
OL-18712-03
Chapter 5 Installing and Upgrading Internal Modules and FRUs
2911 Front to Back Air Flow Converter
Figure 5-43
Back View of the Cisco 2911 Router with the 2911 Air Converter
Figure 5-44
Front View of the Cisco 2911 Router Showing Forced Front-to-Back Air Flow Scheme
Follow these steps to install the 2911 Air Converter:
Step 1
Remove the screws (three on top and three at the bottom) of the 2911 Air Converter. See
Figure 5-45
.
Note
Set aside these six screws for joining the inner and outer piece in
Step 4
.
3
604
3
9
Ci
s
co
2900
S
erie
s
3
60795