3
Contents
1.1.1 Scope .................................................................................................................... 12
1.1.2 Typical time required for assembling options .................................................. 12
1.1.3 Work assignment ................................................................................................ 13
1.1.4 Notes .................................................................................................................... 13
1.2.1 Tools and measuring instruments ..................................................................... 14
1.2.2 Configuration and setting information ............................................................. 15
1.3.1 Environmental requirements ............................................................................ 15
1.3.2 Input power ......................................................................................................... 16
1.3.3 Input power system ............................................................................................ 17
1.3.4 Installation area ................................................................................................. 18
1.4 Setting the FST ......................................................................................................... 19
1.5 Request to system administrator ............................................................................. 20
2.4 Verifying operation .................................................................................................... 23
2.5 Preparation of handing over to the system administrator ..................................... 26
2.6 Handover to the system administrator.................................................................... 26
Содержание C880 M5
Страница 18: ...18 SET0103040 1 3 4 Installation area Confirm installation area when 19 inch rack mounted Figure 1 3 4 ...
Страница 94: ...94 Appendix ...
Страница 97: ...97 Figure B 1 Distribution panel breaker characteristics ...
Страница 102: ...102 Figure D 3 3 When 1 AC Source Figure D 3 4 When 1 AC Source ...
Страница 105: ...105 Figure E 2 1 2 ...
Страница 108: ...108 Figure E 3 1 2 ...
Страница 112: ...112 Figure E 5 1 2 ...
Страница 119: ...119 Figure E 10 2 ...
Страница 120: ...120 APP0600000 Appendix F Handling the Units APP0601000 F 1 Unit location Figure F 1 1 Front Figure F 1 2 Rear ...
Страница 132: ...132 Figure F 7 1 2 3 Hold the groove of the Socket cover and it lift and remove it from the SB See Figure F 7 1 3 ...
Страница 134: ...134 Figure F 7 1 4 5 Tighten the heat sink screw in order number 1 2 3 4 and fix to SB See Figure F 7 1 5 ...
Страница 135: ...135 Figure F 7 1 5 ...
Страница 137: ...137 Figure F 8 1 2 Figure F 8 1 3 ...
Страница 142: ...142 Figure F 9 3 3 Figure F 9 3 4 ...
Страница 144: ...144 Figure F 10 1 3 ...
Страница 152: ...152 Figure F 13 1 1 Module MC 0JXEL1 Figure F 13 1 2 Module MC 0JCEK1 ...
Страница 156: ...156 APP0614000 F 14 Installing M 2 Flash Device See Figure F 14 Figure F 14 ...
Страница 163: ...163 APP0617000 F 17 Installing TPM See Figure F 17 Figure F 17 ...
Страница 165: ...165 Figure G 1 2 ...
Страница 171: ...171 APP0902000 I 2 Fibre Channel card Figure I 2 ...
Страница 172: ...172 APP0903000 I 3 SAS card SAS RAID controller card Figure I 3 ...
Страница 173: ...173 APP0904000 I 4 CNA card Figure I 4 ...
Страница 174: ...174 APP0905000 I 5 Infiniband HCA card Figure I 5 ...