1 Preparations
This chapter provides an overview, including the addition procedure and addition preparations.
ANNT)
If the work procedure for upgrading starts with AC power off status, set power restoration policy
setting "Restore to powered state prior to power loss" or "Always off" before AC power off.
Make sure the setting with the system administrator and modify it if necessary.
Set the default setting after completing the work procedure for upgrading.
See Appendix E.9 “
” for more information.
SET0101000
1.1 Outline
This chapter provides an overview, including the installation procedure and installation preparations.
SET0101010
1.1.1 Scope
This section describes the scope of the addition instructions, typical time required for assembling
options, work assignment, and notes.
SET0101020
1.1.2 Typical time required for assembling options
The following table lists the typical time required for assembling options.
Table 1.1.2 Typical time required for assembling options
Option
Option work time (minute)
System board
46 / unit
CPU
20 / set
Memory
31 / set
PCI card
36 / card
I/O unit B (IOUB)
36 / unit
Disk unit for SAS (DU_SAS)
46 / unit
Disk unit for PCIe SFF (DU_PCIE)
46 / unit
Internal hard disk drive (HDD)
Internal solid state drive (SSD)
31 / drive
Internal PCIe SSD SFF
31 / drive
Power Supply Unit (PSU)
27 / unit
M.2 Flash Device
36 / unit
eLCM Activation License
36 / unit
TPM
36 / unit
Содержание C880 M5
Страница 18: ...18 SET0103040 1 3 4 Installation area Confirm installation area when 19 inch rack mounted Figure 1 3 4 ...
Страница 94: ...94 Appendix ...
Страница 97: ...97 Figure B 1 Distribution panel breaker characteristics ...
Страница 102: ...102 Figure D 3 3 When 1 AC Source Figure D 3 4 When 1 AC Source ...
Страница 105: ...105 Figure E 2 1 2 ...
Страница 108: ...108 Figure E 3 1 2 ...
Страница 112: ...112 Figure E 5 1 2 ...
Страница 119: ...119 Figure E 10 2 ...
Страница 120: ...120 APP0600000 Appendix F Handling the Units APP0601000 F 1 Unit location Figure F 1 1 Front Figure F 1 2 Rear ...
Страница 132: ...132 Figure F 7 1 2 3 Hold the groove of the Socket cover and it lift and remove it from the SB See Figure F 7 1 3 ...
Страница 134: ...134 Figure F 7 1 4 5 Tighten the heat sink screw in order number 1 2 3 4 and fix to SB See Figure F 7 1 5 ...
Страница 135: ...135 Figure F 7 1 5 ...
Страница 137: ...137 Figure F 8 1 2 Figure F 8 1 3 ...
Страница 142: ...142 Figure F 9 3 3 Figure F 9 3 4 ...
Страница 144: ...144 Figure F 10 1 3 ...
Страница 152: ...152 Figure F 13 1 1 Module MC 0JXEL1 Figure F 13 1 2 Module MC 0JCEK1 ...
Страница 156: ...156 APP0614000 F 14 Installing M 2 Flash Device See Figure F 14 Figure F 14 ...
Страница 163: ...163 APP0617000 F 17 Installing TPM See Figure F 17 Figure F 17 ...
Страница 165: ...165 Figure G 1 2 ...
Страница 171: ...171 APP0902000 I 2 Fibre Channel card Figure I 2 ...
Страница 172: ...172 APP0903000 I 3 SAS card SAS RAID controller card Figure I 3 ...
Страница 173: ...173 APP0904000 I 4 CNA card Figure I 4 ...
Страница 174: ...174 APP0905000 I 5 Infiniband HCA card Figure I 5 ...