168
Example of the labels affixed to the array disks that are the first and second ones from the left at the
bottom of a rack
2) According to the installation drawing (cable connection diagram), write down the destinations on
the cable destination labels to be attached to both ends of the cables to be connected.
Cable destination label with ties 25 mm in diameter, 120 mm long.
Figure I-3 Cable destination label with tie
Format of written destination
Format: Xy-ZZZ => (CCC)
Xy: See item 1) above.
ZZZ: Physical location of the connection destination of the connector at this end of the cable (Use the
physical location name referring to the unit concerned.)
CCC: Destination of the connector at the other end of the cable (same format as above)
Example of written labels indicating a connection between port 2 of the PT board in slot 4 of the main
unit (first from the left) and channel 12 of the hub (third from the left)
3) Attach the cable destination labels with ties to both ends of each cable. (Wrap the string at least
twice around the cable or affix cotton tape on the string to prevent the string from moving.)
Make sure that the cable destinations on the two labels attached to each cable are reversed as shown
in
t
he following figure.
Содержание C880 M5
Страница 18: ...18 SET0103040 1 3 4 Installation area Confirm installation area when 19 inch rack mounted Figure 1 3 4 ...
Страница 94: ...94 Appendix ...
Страница 97: ...97 Figure B 1 Distribution panel breaker characteristics ...
Страница 102: ...102 Figure D 3 3 When 1 AC Source Figure D 3 4 When 1 AC Source ...
Страница 105: ...105 Figure E 2 1 2 ...
Страница 108: ...108 Figure E 3 1 2 ...
Страница 112: ...112 Figure E 5 1 2 ...
Страница 119: ...119 Figure E 10 2 ...
Страница 120: ...120 APP0600000 Appendix F Handling the Units APP0601000 F 1 Unit location Figure F 1 1 Front Figure F 1 2 Rear ...
Страница 132: ...132 Figure F 7 1 2 3 Hold the groove of the Socket cover and it lift and remove it from the SB See Figure F 7 1 3 ...
Страница 134: ...134 Figure F 7 1 4 5 Tighten the heat sink screw in order number 1 2 3 4 and fix to SB See Figure F 7 1 5 ...
Страница 135: ...135 Figure F 7 1 5 ...
Страница 137: ...137 Figure F 8 1 2 Figure F 8 1 3 ...
Страница 142: ...142 Figure F 9 3 3 Figure F 9 3 4 ...
Страница 144: ...144 Figure F 10 1 3 ...
Страница 152: ...152 Figure F 13 1 1 Module MC 0JXEL1 Figure F 13 1 2 Module MC 0JCEK1 ...
Страница 156: ...156 APP0614000 F 14 Installing M 2 Flash Device See Figure F 14 Figure F 14 ...
Страница 163: ...163 APP0617000 F 17 Installing TPM See Figure F 17 Figure F 17 ...
Страница 165: ...165 Figure G 1 2 ...
Страница 171: ...171 APP0902000 I 2 Fibre Channel card Figure I 2 ...
Страница 172: ...172 APP0903000 I 3 SAS card SAS RAID controller card Figure I 3 ...
Страница 173: ...173 APP0904000 I 4 CNA card Figure I 4 ...
Страница 174: ...174 APP0905000 I 5 Infiniband HCA card Figure I 5 ...