8
13.4 Verifying operation .................................................................................................. 86
13.5 Preparation of handing over to the system administrator ................................... 88
13.6 Handover to the system administrator.................................................................. 88
14.4 Verifying operation .................................................................................................. 91
14.5 Preparation of handing over to the system administrator ................................... 93
14.6 Handover to the system administrator.................................................................. 93
Appendix A Installation Instructions Sheet ...................................................................... 95
Appendix B Customer's Distribution Panel Breaker Requirements .............................. 96
Appendix C Plug Types ....................................................................................................... 98
D.1 2 PSUs ....................................................................................................................... 99
D.2 3 PSUs ..................................................................................................................... 100
D.3 4 PSUs ..................................................................................................................... 101
E.1.1 When connect the FST directly to the Base Unit by LAN cable .................. 103
E.1.2 When connect the FST to network switch by LAN cable (DHCP disabled) 103
E.1.3 When connect the FST to network switch by LAN cable (DHCP enabled) . 103
E.1.4 When use the operation terminal of customer equipment connected to the
network ....................................................................................................................... 104
Содержание C880 M5
Страница 18: ...18 SET0103040 1 3 4 Installation area Confirm installation area when 19 inch rack mounted Figure 1 3 4 ...
Страница 94: ...94 Appendix ...
Страница 97: ...97 Figure B 1 Distribution panel breaker characteristics ...
Страница 102: ...102 Figure D 3 3 When 1 AC Source Figure D 3 4 When 1 AC Source ...
Страница 105: ...105 Figure E 2 1 2 ...
Страница 108: ...108 Figure E 3 1 2 ...
Страница 112: ...112 Figure E 5 1 2 ...
Страница 119: ...119 Figure E 10 2 ...
Страница 120: ...120 APP0600000 Appendix F Handling the Units APP0601000 F 1 Unit location Figure F 1 1 Front Figure F 1 2 Rear ...
Страница 132: ...132 Figure F 7 1 2 3 Hold the groove of the Socket cover and it lift and remove it from the SB See Figure F 7 1 3 ...
Страница 134: ...134 Figure F 7 1 4 5 Tighten the heat sink screw in order number 1 2 3 4 and fix to SB See Figure F 7 1 5 ...
Страница 135: ...135 Figure F 7 1 5 ...
Страница 137: ...137 Figure F 8 1 2 Figure F 8 1 3 ...
Страница 142: ...142 Figure F 9 3 3 Figure F 9 3 4 ...
Страница 144: ...144 Figure F 10 1 3 ...
Страница 152: ...152 Figure F 13 1 1 Module MC 0JXEL1 Figure F 13 1 2 Module MC 0JCEK1 ...
Страница 156: ...156 APP0614000 F 14 Installing M 2 Flash Device See Figure F 14 Figure F 14 ...
Страница 163: ...163 APP0617000 F 17 Installing TPM See Figure F 17 Figure F 17 ...
Страница 165: ...165 Figure G 1 2 ...
Страница 171: ...171 APP0902000 I 2 Fibre Channel card Figure I 2 ...
Страница 172: ...172 APP0903000 I 3 SAS card SAS RAID controller card Figure I 3 ...
Страница 173: ...173 APP0904000 I 4 CNA card Figure I 4 ...
Страница 174: ...174 APP0905000 I 5 Infiniband HCA card Figure I 5 ...