85
SET1302000
13.2 Work Items, Work Assignment, and Work Time
“Table 13.2” lists the work items, standard work time, and the person in charge of these types of work.
Table 13.2
Work item
Person in charge
Work time
(minute)
Checking the delivered items
Service engineer
5
Installing option
Service engineer
10
Verifying operation
Service engineer
15
Preparation of handing over to
the System Administrator
Service engineer
1
Handover to the system administrator
System administrator and
Service engineer
5
SET1303000
13.3 Procedure for Installing a Micro SD
SET1303010
13.3.1 Checking the delivered items
(1) Check the delivered items by confirming the following.
1. The types and quantities of delivered options match those written on the order sheet.
2. The delivered items match those listed in the List of Accessories.
3. All cabinets are free of any abnormalities such as scratches, dents, or dirt.
4. The specifications and version level of units delivered separately due to delivery considerations
are available for the target functions.
(2) Proceed to “
SET1303020
13.3.2 Installing option
Install according to the following procedures.
ANNT)
- The installation location and quantity have to indicate by the system administrator.
- Confirm connecting position of power cable of the Base Unit beforehand.
(1) Turn off AC power of the Base Unit.
(2) Remove the SB#0.
See Appendix F.2.2 “
(3) Install the Micro SD onto BMM Board of the SB#0.
See Appendix F.15 “
Installing eLCM Activation License
(4) Install the SB#0.
See Appendix F.2.1 “
(5) Turn on AC power of the Base Unit.
→ Wait until
green indicator of the “System Power” turns off.
Содержание C880 M5
Страница 18: ...18 SET0103040 1 3 4 Installation area Confirm installation area when 19 inch rack mounted Figure 1 3 4 ...
Страница 94: ...94 Appendix ...
Страница 97: ...97 Figure B 1 Distribution panel breaker characteristics ...
Страница 102: ...102 Figure D 3 3 When 1 AC Source Figure D 3 4 When 1 AC Source ...
Страница 105: ...105 Figure E 2 1 2 ...
Страница 108: ...108 Figure E 3 1 2 ...
Страница 112: ...112 Figure E 5 1 2 ...
Страница 119: ...119 Figure E 10 2 ...
Страница 120: ...120 APP0600000 Appendix F Handling the Units APP0601000 F 1 Unit location Figure F 1 1 Front Figure F 1 2 Rear ...
Страница 132: ...132 Figure F 7 1 2 3 Hold the groove of the Socket cover and it lift and remove it from the SB See Figure F 7 1 3 ...
Страница 134: ...134 Figure F 7 1 4 5 Tighten the heat sink screw in order number 1 2 3 4 and fix to SB See Figure F 7 1 5 ...
Страница 135: ...135 Figure F 7 1 5 ...
Страница 137: ...137 Figure F 8 1 2 Figure F 8 1 3 ...
Страница 142: ...142 Figure F 9 3 3 Figure F 9 3 4 ...
Страница 144: ...144 Figure F 10 1 3 ...
Страница 152: ...152 Figure F 13 1 1 Module MC 0JXEL1 Figure F 13 1 2 Module MC 0JCEK1 ...
Страница 156: ...156 APP0614000 F 14 Installing M 2 Flash Device See Figure F 14 Figure F 14 ...
Страница 163: ...163 APP0617000 F 17 Installing TPM See Figure F 17 Figure F 17 ...
Страница 165: ...165 Figure G 1 2 ...
Страница 171: ...171 APP0902000 I 2 Fibre Channel card Figure I 2 ...
Страница 172: ...172 APP0903000 I 3 SAS card SAS RAID controller card Figure I 3 ...
Страница 173: ...173 APP0904000 I 4 CNA card Figure I 4 ...
Страница 174: ...174 APP0905000 I 5 Infiniband HCA card Figure I 5 ...