1-58
Cisco ONS 15454 Installation and Operations Guide
November 2001
Chapter 1 Hardware Installation
Cable Routing and Management
Figure 1-36 Routing coaxial cable through the SMB EIA backplane
1.14.3 DS-1 Twisted-Pair Cable Management
Connect twisted pair/DS-1cables to SMB EIAs on the ONS 15454 backplane using cable connectors and
DS-1 electrical interface adapters (balun).
Procedure: Route DS-1 Twisted-Pair Cables
When using DS-1 twisted-pair cables, the backplane cover has cutouts over the SMB cable connectors.
SMB EIAs feature cable-management eyelets for tie wrapping or lacing cables to the cover panel.
Step 1
Install DS-1 electrical interface adapters on every transmit and receive connector for DS-1 ports.
Step 2
Use wire-wrap posts on the DS-1 electrical interface adapters to connect the terminated incoming cables.
Step 3
Tie-wrap or lace the twisted-pair cables according to local site practice and route the cables into the side
cutouts on either side of the ONS 15454.
B
A
Connector ends
Tie-wrap
posts
32079
Tie-wraps
Содержание 15454-TCC - Network Processor Card
Страница 22: ...Figures xxii Cisco ONS 15454 Installation and Operations Guide November 2001 ...
Страница 32: ...Procedures xxxii Cisco ONS 15454 Installation and Operations Guide November 2001 ...
Страница 158: ...3 20 Cisco ONS 15454 Installation and Operations Guide November 2001 Chapter 3 Node Setup Viewing CTC Software Versions ...
Страница 388: ...11 10 Cisco ONS 15454 Installation and Operations Guide November 2001 Chapter 11 SNMP SNMP Remote Network Monitoring ...