7
Instruction Manual
SVGm
1.- VERIFICATION UPON RECEPTION
1�1�- RECEPTION PROTOCOL
Check the following points when you receive the device:
a) The device meets the specifications described in your order.
b) The device has not suffered any damage during transport.
c) Perform an external visual inspection of the device prior to switching it on.
d) Check that it has been delivered with the following:
- Instruction manual
- Communication cable for connecting devices in parallel.(Models
SVGm
Wall and Rac
type).
e) Perform an external and internal visual inspection of the device prior to connecting it.
If any problem is noticed upon reception, immediately contact the transport com-
pany and/or
CIRCUTOR's
after-sales service.
1�2�- TRANSPORT AND HANDLING
The transport, loading and unloading and handling of the device must be carried
out with proper precautions and using the proper manual and mechanical tools so
as not to damage it.
If the device is not to be immediately installed, it must be stored at a location with
a firm and level floor, and the storage conditions listed in the technical features
section must be observed. In this case, it is recommended that the device be stored
with its original protective packaging.
To move the device a short distance, the device’s floor support profiles facilitate handling with a pallet
jack or forklift. (
)
Figure 1: Transport with pallet jack�
Содержание SVGm
Страница 1: ...SVGm M248B01 03 22A Static var generator INSTRUCTION MANUAL ...
Страница 2: ...2 SVGm Instruction Manual ...
Страница 105: ...105 Instruction Manual SVGm 14 CE CERTIFICATE ...
Страница 106: ...106 SVGm Instruction Manual ...
Страница 107: ...107 Instruction Manual SVGm ...