Raption
90
Service Manual
The unit needs regular maintenance and part inspection during its life.
Before starting with the maintenance or with the part replacement procedure, it is very
important to disconnect Charging station from any power source.
Pay attention if you see the following symbols to prevent electrical hazards.
When performing some inspection and servicing at the equipment, except if is absolutely
necessary, make sure to switch OFF all circuit breakers before starting to work.
The charger contains electric, mechanical and consumable components that must be
periodically checked, in order to keep the correct operation of the Charging Station and
keep it in the best conditions thoughout its useful lifetime.
This section informs how to perform the preventive maintenance, the frecuency it should
be done and the components to verify inside the Charging Station.
To perform the first inspection of the
Raption
and the preventive maintenance, please
see the “Wear check list DC chargers”
8
Содержание Raption Series
Страница 1: ...Raption Series SERVICE MANUAL M186C01 03 21B...
Страница 10: ...Raption 10 Service Manual B Dimensions Units specified in millimeters...
Страница 12: ...Raption 12 Service Manual 1 A ELECTRONIC BOARDS ETC Raption 50...
Страница 23: ...Service Manual 23 Raption 6 BLOCK DIAGRAM...
Страница 25: ...Service Manual 25 Raption...
Страница 47: ...Service Manual 47 Raption...
Страница 63: ...Service Manual 63 Raption...
Страница 110: ...Raption 110 Service Manual...