5�1�1�1�3�1�1�-
Graphic view�
shows the graphical display screen.
Figure 68:Demand parameters, graphic view (displays 1 parameter)�
>
>
>
<
<
<
varh
8
1
48h
120m
Back
Main
menu
Integration
time
Figure 69: Graphic view menu�
T
he
integration time
(X-axis) of the chart can be 120 minutes or 48 hours.
Note:
The option selected is not displayed on the menu.
Use the keys
and
to browse the different options.
To access the option selected press the key
.
The menu in the lower area disappears after 3 seconds.
Press the
key to display the lower
area again.
73
Instruction Manual
CVM-A1000 - CVM-A1500
Содержание CVM-A1000
Страница 1: ...INSTRUCTION MANUAL M136B01 03 20A Power analyzer CVM A1000 CVM A1500 MEASURING EQUIPMENT E237816...
Страница 2: ...2 CVM A1000 CVM A1500 Instruction Manual...
Страница 364: ...13 CE CERTIFICATE 364 CVM A1000 CVM A1500 Instruction Manual...
Страница 365: ...365 Instruction Manual CVM A1000 CVM A1500...
Страница 366: ...366 CVM A1000 CVM A1500 Instruction Manual...
Страница 377: ...377 Instruction Manual CVM A1000 CVM A1500...