12
TRANSPORT SAFETY STRAP
The ash container is equipped with a safety strap which must be removed
before use:
1. Remove the front cover.
2. Cut away and remove the plastic straps attaching the ash container to the steel frame.
CONNECTING THE TOILET
After you have finished installing the pipes, gently push the toilet
onto the outlet pipe. The toilet design allows the pipe to enter 35
mm into the toilet venturi, before it stops (fig. 21). Do not force
the pipe into the toilet, as this may damage the toilet. To facilitate
inserting the pipe, use some lubrication on the muff in advance.
Remember to plug in the power supply before use, a green light
on the control panel will be lit when power is connected (fig 22).
SECURING THE TOILET
In order to secure the Cinderella Comfort to the floor:
1. Remove the ash container.
2. Mark the position of the holes on the floor (fig. 23). Remove the toilet.
3. Drill out the holes with an appropriate drill bit depending on the type of floor.
Use suitable screws.
VERIFYING INSTALLATION
To ensure proper function of the system, you can perform an easy performance test.
Performance test:
1. Open the lid and seat – Red light should be lit and the fan starting to blow.
2. Simply insert an Original Cinderella Bowl Liner into the toilet.
3. Add water (1.2 litres) and toilet paper (1 metre)
4. Close the lid and push the start button – Yellow light should be lit. This indicates that the combustion cycle has
been activated).
5. The combustion cycle should take from 60–70 minutes, before it starts to cool down.
6. Wait until the toilet has cooled down and the fan has stopped (this can take up to 60–90 minutes), check the result in the
ash container. You should only see white dust.
If the toilet failed to pass the performance test, please check that all the installation parameters are according to the
manufacturer’s instructions and that the electrical power supply is between 220–240V AC.
IMPORTANT NOTE:
The performance test is designed to be performed when the toilet is new out of the box. Results may
vary when performing this test on used toilets.
FINALISING THE
INSTALLATION
Fig. 21
fig. 22
fig. 23