15 - UNIT START-UP CHECKLIST FOR INSTALLERS PRIOR TO CONTACTING
THE MANUFACTURER
Preliminary information
Job name: ................................................................................................................................................................................................
Location: ..................................................................................................................................................................................................
Installing contractor: ................................................................................................................................................................................
Distributor: ...............................................................................................................................................................................................
Start-up performed by..................................................................... On ...............................................................................................
Equipment
LD or ILD model ............................................................................. Serial number ..............................................................................
Compressors
Circuit A
Circuit B
1. model ......................................................................................... 1. model .......................................................................................
Serial number .............................................................................. Serial number ...........................................................................
2. model ......................................................................................... 2. model .......................................................................................
Serial number .............................................................................. Serial number ...........................................................................
3. model ......................................................................................... 3. model .......................................................................................
Serial number .............................................................................. Serial number ...........................................................................
4. model ......................................................................................... 4. model .......................................................................................
Serial number .............................................................................. Serial number ...........................................................................
Air handling equipment
Manufacturer: ..........................................................................................................................................................................................
model ............................................................................................. Serial number ..............................................................................
Additional air handling units and accessories..........................................................................................................................................
.................................................................................................................................................................................................................
Preliminary equipment check
Is there any shipping damage? .....................................................
If so, where?
................................................................................
.................................................................................................................................................................................................................
Will this damage prevent unit start-up? ...................................................................................................................................................
The unit is installed level
The power supply corresponds to the unit nameplate
Electrical circuit wiring has been sized and installed properly
Unit ground wire has been connected
Electrical circuit protection has been sized and installed properly
All terminals are tight
All cables and thermistors have been inspected for crossed wires
All plug assemblies are tight
Air handling systems check
All air handlers are operating
All chilled water valves are open
All fluid piping is connected properly
All air has been vented from the system
Chilled water pump is operating with the correct rotation. CWP current: Assigned:...............
Actual...................
AQUACIAT
POWER
™ LD/ILD
EN-78
Содержание AQUACIAT POWER LD 1100R
Страница 1: ...AQUACIAT POWER LD 602R 3500R ILD 602R 2000R 12 2021 10590 Instruction manual...
Страница 81: ...EN 81 AQUACIATPOWER LD ILD...
Страница 82: ......
Страница 83: ......