16
GB
ASSEMBLY INSTRUCTIONS
Remove all the separate parts from the packaging, lay
them on the floor and check roughly that all are there
on the base of the assembly steps. Please note that a
number of parts are connected directly to the main
frame preassembled. In addition, there are several
other individual parts that have been attached to
separate units. This will makes assembly easier and
quicker for you. Assembly time: 40 - 50 min.
STEP 1:
Attach the stabilizer (6+7) at main frame (1).
1.
Attach the front foot (6) with the preassembled
end caps with transportrollers (25) to the main frame
(1). Do this with the two screws M8x75 (9), curved
washers 8//20 (12), spring washers (13) and cap nuts
(11).
2.
Attach the rear foot (7) with preassembled end caps
with heightadjustment (26) to the main frame (1).
Do this with the two screws (9), curved washers (12),
spring washers (13) and cap nuts (11).
3.
Attach the transportation grip (49) at rear foot (7)
with screws M8x75(50) Curved washers (12) and
spring washers (13)
4.
Screw in the rubber foot (28) into the appropria
-
te threat of main frame (1) and secure position with
nut (23). After assembly has been completed, you
can compensate for minor irregularities in the floor
by turning the wheel at end cap (26) and rubber foot
(28). The equipment should be set up that the equip
-
ment does not move of its own accord during a trai-
ning session. If you like to change the position of the
recumbentbike, lift up at transportation grip (49) until
you can move easy on the front transportation rollers
to another place.
STEP 2:
Attach the pedal (27L+27R) at pedal crank (40L+40R).
1.
Screw the right pedal (27R) into the locator in the
right-hand side (as seen in operation) for the pedal
crank (40R) (Warning! the screw direction is clockwi
-
se).
2.
Screw the left pedal (27L) into the locator in the left-
hand side (as seen in operation) for the pedal crank
(40L) (Warning! the screw direction is anti-clockwise).
3.
Then mount the pedal straps left and right on the
associated pedals (27). (The pedals are signed with
“L” for Left and “R” for Right.)
Содержание 2091
Страница 3: ...3 MONTAGEÜBERSICHT ASSEMBLY OVERVIEW DE GB ...
Страница 14: ...14 DE NOTIZEN ...
Страница 26: ...26 GB NOTES ...
Страница 27: ...27 ...