![Christie MicroTiles Скачать руководство пользователя страница 19](http://html1.mh-extra.com/html/christie/microtiles/microtiles_installation-and-setup-manual_2603481019.webp)
The leveling feet come equipped with machined points for bolting the array down; however, fastening
hardware is not supplied.
A
Center leveling foot
B
Left leveling foot
C
Right leveling foot
D
Shim
1. Ensure the surface underneath the array is flat before installing the leveling feet.
2. Use either M6 or 1/4” hardware to attach the mounting feet to the base structure.
Follow all local safety standard and regulations when bolting the array.
Assembling the first row of tiles
When installing an array without leveling feet ensure the surface is flat. Do not install vertical screws
in the bottom row of installations without leveling feet.
It is advised that when an array is set up near a wall to connect the cables row by row. When setting
up an array where the back is exposed, first setup the entire array and then connect the wires. Ensure
all latches are open before assembling the array.
Installation and Setup
Christie MicroTiles Installation and Setup Guide
19
020-100329-15 Rev. 1 (05-2018)
Copyright
©
2018 Christie Digital Systems USA, Inc. All rights reserved.
Содержание MicroTiles
Страница 1: ...Installation and Setup Guide 020 100329 15 Christie MicroTiles ...
Страница 43: ......