Turbo-Cool 6” Recirculating Evaporative Cooling System Manual
20
6. If the last Cover is too long, trim the Cover as shown in
Figure 16
and overlap
it with the previous Cover. Use (2) 10-16 x 1/2” Screws to join the Covers
together.
Figure 16. Cover Trimming and Assembly
System Start-Up
1. Turn the Adjustment Knob on the Water Level Regulator clockwise to the
fully closed position. Turn on the water supply.
2. The water level adjustment knob is on the back of the Regulator near the
Chore-Time logo. To increase the water level turn the knob in the direction of
the “I” or “+”. To decrease the water level turn the knob in the direction of the
“D” or “-”. See
Figure 17
.
Figure 17. Water Level Regulator
3. With the pump off (i.e. unplugged), Turn the Adjustment Knob on the Water
Level Regulator Counter-clockwise to raise the water level to 1” (2.5 cm)
below the top of the overflow pipe in the sump.
Item
Description
1
Required Length of last Cover
2
2” (5 cm)
3
Cutting line
4
10-16 x 1/2” Screw
5
Cover
Item
Description
1
Adjustment Knob (Water Level Regulator)