6
Turbo-Cool 6” Recirculating Evaporative Cooling System Manual
Technical Information
Required water supply:
2.0 gpm per 100 sq. ft. of pad at 100°F 20% Relative
Humidity
Supply water pressure:
30 - 45 psi
Water Quality:
6 - 9 PH, salt concentration less than 40,000 ppm
Air Speed Through Pad:
Munters Celdek & Glacier Core 45°/15° pad-- 425 cfm/sq. ft.
Munters Mi-T-Cool-- 500 cfm/sq. ft.
Required electrical service:
230 V. 1-Phs, 50/60 Hz. , 4.8 amp
Maximum pad length per pump:
50’ at 60 Hz, 40’ at 50 Hz.
Important
Chore-Time Equipment strongly recommends that a good alarm system should be installed in
confinement buildings to warn of power failure and high temperature.
Chore-Time Equipment also recommends that an alternate power source be available for
confinement buildings in case of power failure.
Tools Required for Installation
Socket Wrench • 1/2” & 5/16” Sockets • Drill and 5/16” Drill Bit • 1/2” Wrench • Teflon Tape
PVC Cement • Utility Knife • Saw
Planning Information
Figure 1
shows recommended Evaporative Cooling Pads vs. Tunnel Fan locations.
Figure 1. Possible Evaporative Cooling System Layouts (top view)
Key Description
1
Cooling Pads
2
Tunnel Fans