Turbo-Cool 6” Recirculating Evaporative Cooling System Manual
18
Evaporative Cooling Pan and Cover Installation
1. Set the Evaporative Cooling Pads on the Pad Supports. See
Figure 13
. The top
of the Pads should be against the Splash Plate and directly below the
Distribution Pipe.
Make sure the Pads are properly oriented.
MUNTERS Pads:
Refer to the directional arrows on the side of the pads.
GLACIER Pads:
May have a blue stripe which indicates the top end of pads
and the air inlet side of the pads.
If no stripe is present, refer to
Figure 14
to determine the proper pad orientation
based on the direction of the pad flutes vs. direction of incoming air flow.
Begin installing pads at either end.
Make sure the first pad is against the End Panels.
Push Pads tightly together and keep as vertical as possible.
Figure 13. Pad Installation
Item
Description
1
Munters Pad
2
Glacier Pad