
Chore-Tronics Feeder Control
Installation and Operation of Scale Load Cells
73
MT1559A
10/6/99
Replacing a CT Load Cell
1. Disconnect load cell from junction box and detach cable from frame.
2. Remove cotter key (item 5) from stabilizer safety pins (item 6) and
remove stabilizer pins.
3. Using a hydraulic jack, lift the corner of the bin high enough to remove
load cell (item 1).
4. Check sealing ring (item 2) and pads (item 7) to see that they are in good
repair. Replace if necessary.
5. Lower corner of bin and reassemble mount.
Side bar (item 8) is threaded to receive bolts (item 4). It is important
that bolts (item 4) not be tightened all the way. Leave 1/8” clearance
for side bars (items 3 and 8) to move freely.
6. Route cell cable to junction box and connect leads.
Key
Description
1
C.T. Load Cell
2
Sealing Ring
3
C.T. Mount Welded Plate
4
Hex Head Bolt
5
Cotter Pin
6
C.T. Mount Pin
7
Rubber Shim
8
C.T. Mount Threaded Plate
{Note}
*
3/25/99
Содержание Feeder Control
Страница 1: ...70 MT1559 01 7 98 MT1559A March 1999...