Installation and Operation of Scale Load Cells
Chore-Tronics Feeder Control
66
MT1559A
10/6/99
Step 4: Properly Coiling the Cables
The excess SJB and Load Cell Cables must be non-inductively coiled as shown,
below. Note that when coiled in this manner, there will be an equal number of right
hand and left hand coils. See Figure 30.
DO NOT CUT THE CABLES.
Use wire ties to secure the excess cable coils to the bin structure, as shown.
Step 5: Grounding the System
Ground Rod Specifications:
The ground rod must be 8' or 2.4 meters long (minimum) and must be free of non-
conductive coatings, such as paint or enamel. The ground rod must be made from
either: 1) 3/4" (19 mm) diameter or larger galvanized pipe, or 2) 1/2" (13 mm)
diameter or larger copper-clad or solid copper rod.
{Note}
*
MF973-29 3/96
3
2
1
LOAD CELL CABLES MUST NOT BE CUT
Key
Description
1
Junction Box
2
Coil the excess cable and wire tie to bin leg
3
Carefully route the cable along the bin framing
4
Allow enough cable for drip loop
5
Cable Tie
Figure 30. Cable Routing and Coiling (front view)
3/25/99