
Installation and Operation of Scale Load Cells
Chore-Tronics Feeder Control
64
MT1559A
10/6/99
Step 3: SJB Location & Installation
The SJB is water resistant, but not water proof. Mount the SJB on a bin leg, nearby
wall or other structure, using hardware supplied. See Figure 29.
The SJB must be mounted close enough to the Mount Bases so that each individual
cable will reach the SJB.
Ground the SJB and Power Supply to a nearby ground rod. Connect the ground cable
to the round position of Power Supply and SJB.
THIS SYMBOL REPRESENT ALTERNATIVE MOUNTING LOCATIONS, CHOOSE ONE.
J
J
J
MT1559-20 3/99
Figure 29. Mount Base Installation (side view)
3/25/99
Содержание Feeder Control
Страница 1: ...70 MT1559 01 7 98 MT1559A March 1999...