Installation Instructions
SLEU
5
SITE PREPARATION
Site Preparation
Because of the wide variety of possible mounting situations,
Chief Manufacturing can only provide general guidelines for
preparing the location where the SLEU will be installed. Study
the following information carefully, and adapt it as necessary to
fit your specific installation.
The installation instructions that follow cover the three most
common mounting scenarios:
•
Suspended from a 1 1/2" NPT pipe that is secured to a
structural cross brace in the ceiling.
•
Suspended from three 1/4" threaded rods that are
secured to the structural cross brace.
•
Side-mounted to the ceiling joists, or secured to a wood
framework that is mounted to the ceiling joists.
IMPORTANT ! :
If the lift is to be installed in a suspended
ceiling, a CMA-240 Suspended Ceiling Installation Kit is
available as an accessory to fill gap(s) in the ceiling.
Prepare Opening
1.
Carefully determine the position of the ceiling opening, and
its distance from (throw distance) and orientation to, the
target (area onto which the image will be projected).
2.
Prepare an opening in the ceiling. (See figure 3) also
(See figure 2)
Figure 2
Power Requirements and Wiring
The SLEU requires 220/240VAC 50 Hz power to operate and
draws approximately 80 watts.
WARNING:
ELECTRIC SHOCK AND FIRE HAZARD!
IMPROPER INSTALLATION OF WIRING CAN LEAD TO
SEVERE PERSONAL INJURY OR RISK OF FIRE! The
installation of this lift requires it be hard wired. ALWAYS have
wiring installed by a qualified electrician and follow all
electrical codes.
1.
Locate and install lift control switch. (not provided)
WARNING:
ELECTRIC SHOCK HAZARD!
DO NOT
provide power to switch or energize circuit until lift has been
fully installed in ceiling and all connections have been made
and verified.
2.
Connect control wires to switch and route power, lift control,
projector power and signal wires to opening in ceiling.
(See figure 3) and (See figure 4)
IMPORTANT ! :
Allow enough excess wiring and cable at the
opening in ceiling to allow wires and cables to be routed into lift
box prior to the lift box being placed into the ceiling.
CAUTION:
RUNNING POWER AND SIGNAL CABLE IN
CLOSE PROXIMITY TO ONE ANOTHER CAN LEAD TO
SIGNAL DETERIORATION! ALWAYS route power and
signal wires and cable through separate conduit or a
minimum of 3" apart.
Figure 3
IMPORTANT ! :
It may be necessary to install an outlet inside
the J-Box (within the lift box) in order to provide power to the
projector.
Extra Length for
routing into lift
prior to placing
lift into ceiling.
Lift Control Switch