Installation Instructions
MSP-WLB/D SERIES
17
WL9D, WL10D, WL11D, WL12D and WL13D
1.
Press insides of cable management covers at both ends to
unhinge tabs on either end of cable management cover on
upper arm. (See Figure 39)
2.
Lift cable management cover up until tabs are unhinged and
cover is in the “open” position. (See Figure 39)
Figure 39
Figure 40
3.
Route cables through cable management channels. (See
Figure 40)
IMPORTANT ! :
Be sure to leave enough slack in the
cables near display and arm joint to allow for full arm
articulation!
4.
Close cable management covers on monitor arm. (See
Figure 40)
5.
Repeat Steps 1-4 for lower arm.
Adjustments
WL2B and 3B
Display Adjustment
Vertical position:
1.
Using your fingers, slightly loosen adjustment knob “A”.
(See Figure 41)
2.
Slide display to desired position.
3.
Using your fingers, tighten adjustment knob “A”. (See
Figure 41)
PITCH / YAW / ROLL Tension
1.
Using your fingers, slightly loosen adjustment knob “B”.
(See Figure 41)
2.
Adjust display as desired.
3.
Using your fingers, tighten adjustment knob “B”.
Figure 41
Swing Arm Tension (WL2B only)
1.
Using 3/16” hex wrench (DD), loosen or tighten adjustment
screw(s) as necessary. (See Figure 42)
Figure 42
cable management cover tabs
1
2
2
2
4
4
3
3
cable (typical)
(A)
(B)
Содержание MSP-WL10D
Страница 21: ...Installation Instructions MSP WLB D SERIES 21 ...
Страница 22: ...MSP WLB D SERIES Installation Instructions 22 ...
Страница 23: ...Installation Instructions MSP WLB D SERIES 23 ...