36.360
50.398
24.012
36.620
18.034
30.000
90.215
24.012
ADD APPOX
WHERE SHOWN
NOTES:
1. PLUMBING IS FOR VISUAL PURPOSES ONLY TO
SHOW COMPONENT CONNECTION. ROUTE TUBING
IN THE BEST WAY FEASIBLE.
REVISIONS
ZONE REV.
DESCRIPTION
DATE
APPROVED
Q
ECN T6632; ADD C15756,C14023,7200-0084
6/12/2015
TC
T
ECN T7152; UPDATED BOM
3/29/16
TC
U
ECN T7249; ADDED ASSY VIEWS, RENUMBERED BOM
4/19/16
TC
V
ECN T414; CHANGED QTY FROM 10" TO 72" FOR ITEM 58.
10/5/2016
JS
W
ECN T8968; REPLACED C09772 W/ C17605
7/24/2020
JS
Y
ECN T9115; ADDED C11266
2/22/2021
JS
A
1
A
BREAK EDGES, DEBURR
UON DIMS ARE IN INCHES
1 PLC
0.030 2 PLC 0.010
3 PLC
0.005 ANGL 1/2
SURFACE FINISH 63 RMS
THIRD ANGLE PROJECTION
2/1/2000
2/1/2007
2/2/2007
SHEET 1 OF 6
TITLE BLOCK REV 3
CHANDLER ENGINEERING
SIZE D
REV Y
CEMENT HYDRATION ANALYZER
PN: 7200A
PROJ:
DRAWN: DAH
MFG: JJM
ENGR: JJM
TYPE:
STRUCT:
THIS DOCUMENT AND THE DRAWINGS AND
TECHNICAL DATA CONTAINED HEREON ARE THE
PROPERTY OF CHANDLER ENGINEERING COMPANY
LLC. REPRODUCTION OR DISSEMINATION IN ANY
FORM EXCEPT AS EXPRESSLY AUTHORIZED BY THE
OWNER IS FORBIDDEN. THE HOLDER AGREES TO
RETURN THE DOCUMENT TO THE OWNER ON
DEMAND. COPYRIGHT BY CHANDLER ENGINEERING
COMPANY LLC
1
D
F
C
B
E
2
3
5
6
7
8
4
B
C
D
E
F
G
H
G
H
9
10
11
12
2
3
4
5
6
7
8
9
10
11
12
Содержание AMETEK 7200
Страница 10: ......
Страница 16: ...2 2 SECTION 2 OPERATING INSTRUCTIONS Figure 1 Front Panel...
Страница 38: ......
Страница 48: ...5 2 SECTION 5 TROUBLESHOOTING GUIDE This page is intentionally left blank...
Страница 50: ...6 2 SECTION 6 REPLACEMENT PARTS This page is intentionally left blank...
Страница 52: ...6 2 SECTION 6 REPLACEMENT PARTS This page is intentionally left blank...
Страница 65: ...CHANDLER ENGINEERING...
Страница 66: ......
Страница 76: ...cut out postcards on dotted lines...