INITIAL START-UP
(Cont.)
5
4
3
THE POWER SWITCH IS
ON DURING INITIAL FILL.
Make sure the doors are fully closed.
Push the On/Off power
switch to the UP position.
THE DISHWASHER FILLS
AUTOMATICALLY.
Note that the power indicator
light is illuminated.
Check Wash
Water Temperature
The wash tank heater and
the booster tank heater (D-HBT only)
will begin to heat the water in
the dishwasher.
Wait approximately 10 minutes
for the wash tank water to
reach operating temperature.
The temperature should be a minimum
of 150˚F/66˚C for (D-HBT, D-H1T).
Prescrap the dishes. Load ware into
the dishrack. Open the doors, insert the
rack into the dishwasher.
12
INITIAL START-UP
POWER
CYCLE
3 MIN
6 MIN
1 MIN
2 MIN
WASH CYCLE
RINSE PRESSURE
WASH TEMPERATURE
ON
OFF
POWER
CYCLE
3 MIN
6 MIN
1 MIN
2 MIN
WASH CYCLE
RINSE PRESSURE
WASH TEMPERATURE
ON
OFF
POWER
CYCLE
3 MIN
6 MIN
1 MIN
2 MIN
WASH CYCLE
RINSE PRESSURE
WASH TEMPERATURE
ON
OFF
Содержание D-H1T
Страница 37: ...REPLACEMENT PARTS 31 REPLACEMENT PARTS ...
Страница 38: ...Figure 19 D HBT D H1T Panels REPLACEMENT PARTS 32 7 12 10 10 11 11 10 6 1 5 9 6 8 2 3 4 9 9 7 8 ...
Страница 70: ...Figure 35 Dishracks and PRV REPLACEMENT PARTS 64 1 2 3 ...
Страница 73: ...REPLACEMENT PARTS 67 ELECTRICAL SCHEMATICS ...