9
Site Preparation
Check the national and local building codes
BEFORE
installation. Refer also to the
Site Planning Safety Checklist
in the Appendix.
Gate
Gate must be constructed and installed according to ASTM F2200
standards (refer to page 4). Gate must fit specifications of operator (refer
to specifications).
Inside Property
Conduit and Concrete Pad
Trench and install conduit. Before trenching, contact underground utility
locating companies. Conduit must be UL approved for low and high
voltage. Consider the operator placement BEFORE installing the pad or
post.
Concrete Pads
Inside Property
Safety
Entrapment protection devices are required to protect against any
entrapment or safety conditions encountered in your gate application.
Install a warning sign (two provided) on the inside and outside of the
property, where easily visible.
Entrapment Danger
Inside Property
Warning Signs
Additional Accessories
The vehicle loops allow the gate to stay open when vehicles are
obstructing the gate path. Suggested for vehicles 14 feet (4.27 m) or
longer. Vehicle loops are not required but are recommended. Before
installing your Access Control Device(s) be sure to complete a site survey
and determine the best device for your site needs.
Access Control
Device
Outside Property
Vehicle Loops
Check your gate
Gate MUST be level. Gate and gate
post MUST be plumb. Gate MUST
have a smooth bottom edge, no
protrusions should exist.
Remove ANY/ALL wheels from the
bottom of gate.
Gate MUST NOT hit or drag across
ground
Gate MUST swing freely and be
supported entirely by its hinges.
INTRODUCTION
Содержание HDSW24UL
Страница 63: ...This page intentionally left blank ...