Cetetherm AquaEfficiency
Installation, service and operating instruction
44
11.16 Autotest menu
Accessing the Autotest menu requires login at Technician level.
This submenu allows testing analog (contacts) and digital (0-10V) outputs that manage pumps start/stop, both
programmable relays, 230V Triac output, pumps’ speeds and valves’ signals. It is possible to run an automatic
sequence or to test manually each output individually.
In case of Auto test (automatic sequence), it is possible to reduce or increase tests’ temporizations. Pump,
valve and relays test times can be adjusted individually. The time test value will impact on the total auto test
time sequence.
Parameter
Factory
Default
Setting
Optional Setting
Description
Start AutoTest
0
0/1
Set 1 to start auto test. When finished, the value
goes back to zero.
Pump_Fault_Reset
Off
Off/On
Pump time test
4 sec
1-60 sec
The time each pump is activated during the test
Valve time test
4 sec
1-60 sec
Temporisations to adjust test duration.
Alarm time test
4
1-60 sec
Individual output reading / writing
Cmd_P1
Off
Off/On
Activate relay 1 (pump 1)
Cmd_P2
Off
Off/On
Activate relay 2 (pump 2)
Speed_P1P2
xx %
0-100 %
The volt value sent to the pump
Cmd_P3
Off
Off/On
Activate relay 3 (pump 3)
Cmd_P4
Off
Off/On
Activate relay 4 (pump 4)
Speed_P3P4
xx %
0-100 %
The volt value sent to the pump
Relay 2
Off
On/Off
Individual output
reading / writing
Relay 1
Off
On/Off
Triac_Output
Off
On/Off
Valve signal
xx %
0-100 %
Valve2 signal
xx %
0-100 %
Valve_DO
xx %
0-100 %
NOTE!
Once test is manually done and finished, remember to put the point on Automatic mode, logo
.
Содержание AquaEfficiency EFB112 DD
Страница 82: ...Cetetherm AquaEfficiency Installation service and operating instruction 80 Commissioning report...
Страница 83: ...Cetetherm AquaEfficiency Installation service and operating instruction 81 Declaration of conformity...
Страница 85: ......
Страница 86: ......